Schneider Cubicle Wiring And How To Operate Maintenance Conditions

One of several types of cubicles there are also schneider type cubicles. This cubicle is a medium voltage panel that has the function of controlling, measuring, switching and protecting 20 KV electricity. As one of the important components of medium voltage electricity, it certainly has procedures for operating it. Here you are explained how to operate a Schneider cubicle under maintenance conditions that exist in the electrical system auxiliary requirements. For this reason, in the following we will provide an explanation of Schneider cubicle wiring and how to operate it under maintenance conditions.

4 Steps to Operate a Schneider Cubicle in Maintenance Conditions

One of the cubicles in electricity demand is the Schneider cubicle which can control up to protect electricity up to a capacity of 20 KV. With important functions as explained earlier, you will certainly know that the materials used to make this type of cubicle are made from the best materials. The cubicle can be used to control the main switch and protect the circuit as well. Apart from the functions explained earlier to you, this cubicle also has several ways it can be used for operation under maintenance conditions. It doesn’t hurt to listen to several ways to operate Schneider cubicle wiring under the following maintenance conditions.

1. Lock Wand Inserted in Locker

The first step you can take when the Schneider cubicle is in maintenance condition is to insert the lock rod in the lock. To put the key stick into the lock is done by turning the lock direction. In rotating the direction of the lock you need to pay attention to the balance of rotation. By balancing the rotation of the stick, over time it will enter the lock. Inserting the rod into the locking Schneider cubicle is the first step in operating the maintenance condition.

2. Lift the Panel Door To Open It

After the first step of inserting the key stick towards the lock. The second step you can take to operate this cubicle in a maintenance state is to lift the panel door to open it. How to open the panel door is done by lifting the panel door so that it can be opened. Before opening the panel door, make sure you have repeated the first step on the metering and output section. This step is carried out sequentially so that maintenance of the panel condition can run well.

3. Metering 3 Components

After successfully opening the panel door in the second step that has been done. The next step is to check and measure the three components in the Schneider cubicle. The three components measured in this type of cubicle are the fuse, PMT and transformer. By doing metering you will find out the condition of the three components whether they are still good or not. This is done so that the conditions of the three components will always be good and ready to use when the Schneider cubicle wiring is working. So, by checking and measuring the fuse, PMT and transformer will know that this step is also important during maintenance.

4. Inserting Stick Into Lock To Remove Grounding

After doing the three methods above that can be used when maintaining the condition of this cubicle. The next and final step that can be done is to insert a locking rod to help remove the grounding. To remove the grounding in the cubicle, you can do it by inserting the stick into the lock and then turning it to the left. By turning the stick to the left, the grounding position will return to its original position.

That’s a complete explanation regarding the explanation of Schneider cubicle wiring and how to operate it when carrying out maintenance conditions that you can use as a reference. So make sure you understand the steps that can be taken when operating the cubicle under the maintenance conditions described in this article. I hope this helps.

Related Posts

mengenal-lebih-dekat-dengan-sobat-listrik-galleon-cahaya-investama
Get to know Bank Capacitor Panels with the GCI Team
Panel Capacitor Bank is a panel consisting of several capacitor units mounted in series or parallel. Bank...
Maintenance-dan-Purifikasi-Trafo-galleon-cahaya-investama
Transformer Maintenance and Purification
When a transformer is used continuously, the performance or quality of the oil will decrease physically, electrically...
Sinkronisasi-panel-genset-galleon-cahaya-investama
Genset Panel Synchronization
Synchronization is a combination of two or more sources of electricity, to obtain a larger source of...
Obrolan-Sobat-Listrik-Panel-ATS–AMF-galleon-cahaya-investama
Electric Buddy Chat #02 : Panel ATS – AMF
After previously the GCI Team discussed the Capacitor Bank Panel, this time the GCI Team is back...
Product Box BG - Ulusoy
Galleon X Ulusoy "Collaboration Towards a Creative and Innovative Electrical Industry"
Do you know? Since 2018, Galleon has officially collaborated with a brand from Turkey, namely the Ulusoy...
Wajah-Baru-PT-Galleon-Cahaya-Investama
The New Face of PT. Galleon Cahaya Investama
PT Galleon Cahaya Investama is a professional electrical contractor company and official Ulusoy distributor in Indonesia which...
Bertumbuh-untuk-Berbagi-galleon-cahaya-investama
Growing to Share
In line with the vision and mission of PT. Galleon Cahaya Investama to grow, develop and prosper...
maintenance-service-pt-galleon-investama
Fulfilling Customer Satisfaction in the Pandemic Era
PT. Galleon Cahaya Investama is the answer to the need for services for all electrical needs in...

> Get in touch

Get Free Consultation

or